B.A.Zanditon's Southbank Rubbings


Table of rubbings, Queen Elizabeth Hall and Hayward Gallery: site, surface, content

 

SITE: HAYWARD GALLERY
Total rubbings 55. Interior 21. Exterior 34

Surface

Content

Concrete

Formwork: staircases, ramp, parapets, walls, mushroom pillar.
Internal and external floor tiles.
Benches, balustrades.
Stalagmite on paving (calcium carbonate).

Wood

Doors.

Metal

Brass fittings on glass balustrade.
Stud in upper gallery floor.
Drains.

Spalling

External staircase.
Exposed metal rods on top of interior balustrade.

SITE: QUEEN ELIZABETH HALL and PURCELL ROOM
Total rubbings 42. Plant room 21

Surface

Content

Concrete

Walls including concrete skim over original ply shuttering.
Bench.

Wood

Doors.
Interior wall.

Metal

Plant room machinery including stairs, heating vents, signage.
Foyer door frame and handles, window frame, heating panel and vents in foyer, signage.

Marble

Walls.
Dedicatory wall plaque.
Foyer floor.

Brick

Plant room internal walls.

Ceramic

White wall tiles.
Red quarry tiles.

Plastic

Plant room signage.

Rubber

Flange around wooden door in brick wall surrounding plant machinery.

Fibrous material

Large bricks made from fibrous material forming interior wall.

 

Contact B.A.Zanditon

Return to the home page